Construction & Maintenance Projects

Home Services

Construction & Maintenance Projects

No

Client

Project

Period

1

DNO

MECHANICAL, PIPING AND STRUCTURAL CONSTRUCTION SERVICES in Tawki oil Field

April. 2017 -  Sep. 2018

Full construction and test for 6” Pipeline in Benenan field in Erbil

Jan. 2018- Present

Installation testing & commissioning  of 44 km Fiber Optic Cable (FOC) in Tawki Oil Field

Jan. 2016 – May 2016

 

2

SCOP

Construction of 24" pipeline 30 km by using automatic welding technology.

Jan. 2014 – Feb 2015

3

GAZPROM

Repair & Maintenance for (8”,22”,24” & 28” & GRE (4”&16”)) pipelines in Badra Oil Field including :

  • Pipeline Damages Repair (Sleeve Repair,  Composite wrapping , Welding Repair &  Clamp Installation)
  • Hot tapping
  • FOC Repair
  • Cathodic Protection (CP) Repair

Oct. 2016 - Present

4

Sonangol Operations DMCC

Three Tanks construction (2 crude oil storage tank 5000 m³ ( 24.384 m x 15.0 m)) external floating roof Type and  One Fire water storage tanks (9.144 m x 11.0 m) fixed roof Type in QAIYARAH NDS.

Jan. 2019 -Present

5

CHIYODA

NGL Maintenance supervision (Static equipment, rotary equipment, electrical, civil, heat exchanger cleaning, instrumentation, valve inspection, Overhead cranes rehabilitation, HSE supervision)

May 2014 – Nov. 2015

6

BGC / SHELL

Overhead cranes rehabilitation

Aug. 2014 – May 2015

7

BGC

Install Gangway at Umm Qaser 

Feb. 2018-Till Present

8

Crescent  

 

Maintenance for 24” gas pipeline with Hot tapping in  Chamchamal 61km

March 2016- April 2016 

Survey, Design, Fabrication and installation of 6” piping Sch. 160 in  Khormor LPG Plant in Kurdistan Region

including NDT (RT & Hydrostatic), Sandblasting and Coating , Packing and installation at site, civil work .

Oct. 2018 -Present

9

TAQA

Engineering, supply and installation of heat insulation — diesel lines at CPF in Atrush oil field

Jan 2017- Till present

10

CCC

Electrical construction, Test and commissioning of MV &LV system of Gas plant in Rumaila oil field.

Oct. 2015 –April 2016

 

 

11

Bonatti

Oily Water pipes repair activities in Badra Oil Field

Including fabrication and welding

Nov. 2018 –Jan. 2019

Painting of Pipe spool in Badra Oil Field

Nov. 2018 –Jan. 2019

Fabrication of 2” CS Spool  in Badra Oil Field

Dec. 2018 – Jan. 2019

CCR Chiller connection pipe spools fabrication by welding

Dec. 2018 –Jan. 2019

12

Alinmaa Company

Extension, Test & Commissioning of al baker 132 kv GIS substation

Feb. 2016 –June 2016

13

Saad Company

Fabrication & Installation of the Piping (Carbon Steel & Stainless Steel) in different pipe sizes for catalytic reforming unit in Basra refinaly 

Jan 2012 – July 2012

14

Shell/Majnoon

Fixing of Control Network in MAJNOON Field in DS1 & DS2 With Shell Company As Well As QC For All CPF Structure Coordinates.

 

Oct. 2010 –  2015

15

Technip

Rehabilitation (Electrical & Mechanical) of overhead cranes (10 T &20 T) in Basra gas factory.

Dec. 2014  – May 2015

 

16

KAR GROUP

-Maintenance work for Erbil refinery equipment ( pressure vessels, towers, heat exchanger , piping , valves )

-Pressure safety valve repair and setup

April  2015- june  2015

Instrument system installation, test and commissioning for Erbil refinery unit 1 & 2

Oct. 2008 – May 2010

Instrument system installation, test and commissioning for Erbil refinery unit 3 & 4

April 2010 - Sep. 2010

17

CPECC AHDAB Oil Field)

Pipeline full construction, NDT (100% RT, 100% UT), 100% PWHT, CP, hydrostatic for:

-155 KM, 6“ Flow lines

-81KM ,16” trunk line

-70KM 10” Export pipeline

-70KM 16” export Gas pipeline

Laying ,splicing and test of 81KM FOC

 

Sep. 2010 To 2012

18

Cpecc (Halfaya Oil Field)

Pipeline construction, NDT (100% RT, 100%UT, 100% PWHT), CP, FOC, hydrostatic for around 35 KM (6'', 8'', 10'') flow lines.

Feb. 2012 – Dec 2012

19

 Halliburton

-Fabrication  of steel structures in NYCO workshop

 

Nov. 2010 To 2012

20

INTECH INSTRUMENT LTD

Instrumentation system installation, testing and commissioning and calibration Work in Shikhan Oil Field.

July 2012 – Dec. 2012

21

Al-Hayat Co 

Installation, test and commissioning of Pepsi cola factory /Erbil (Mechanical, Electrical & Instrumentation).

Feb. – June 2008

22

 Al Mansuria Company

Rehabilitation of Jurf Albamer water treatment plant( electrical, Instrumentation, Mechanical)

2004

23

Al Mansuria Company

Rehabilitation of Al Ramadi Al jadeed water treatment  plant

  • 10”x500 m ductal iron pipeline,
  • water intake station,
  • rehabilitation work for  electrical, Instrumentation, mechanical )

2004

24

ALMCO Co. (Parsons Subcontractor)

Construction of Alsader Water Treatment Plant(Tanks, piping, electrical ,instrumentation ,civil)

Nov. 2005 – Feb. 2008

25

Pioneer

Rehabilitation Al-Rustomia & Al-Karkh Sewage Treatment Plant

  • construction of 16” x1500m Ductile pipeline
  • construction of piping, electrical ,instrumentation ,civil)

Sep. 2004 – April 2005

26

South East Texas Co.

Mechanical Construction in Al Musaiab Gas Power Station(storage tanks , piping networks & steel structures)

July 2004 – Feb. 2006

 

27

KADO Co. (PARSONS Subcontractor)

 

Construction of Al- Zafaraniya Trunk Sewer Line-Pump Station.

May 2006 – July 2006

NYCO Group