Plant Integrity , NDT and PWHT Project List

Home Services

Plant Integrity , NDT and PWHT Project List

No.

Client

Project

Period

 

1

BP  

Plant integrity with full NDT services for south and north rumaila oil field (Five years Contract) including the following activities:

  • Static Equipment integrity (Storage tanks, pressure vessels, piping systems, pipeline ) by supervision of certified inspectors ((API 510, API 570 & API 653)and welding inspectors (Cswip 3.2 & Cswip 3.1) )
  • Advance NDT Services (PAUT, TOFD, PMI)
  • Conventional NDT (RT (Gamma Ray & X-Ray (Crawler and Directional)), UT(Flaw detection and Thickness ), PT, MT, Vacuum Test , Hardness Test, Soil compaction test )
  • Corrosion Mapping (RMS, MFL & Computerize Radiography (CR))
  • Coating inspection by certified engineers (NACE & BGAS) including (Surface test, painting and coating test & holiday test )
  • PWHT Services

May 2017 – May 2022

 

 

Full NDT Services (Conventional & Advance) and PWHT for south and north Rumaila oil field (three years Contract).

April 2014 – April 2017

 

2

BGC / SHELL

Plant integrity with NDT services (Conventional , Advance & Corrosion Mapping) including :

  • Integrity Coordination and Management
  • Static Equipment integrity (Storage tanks, pressure vessels, piping systems, pipeline ) by supervision of certified inspectors ((API 510, API 570 & API 653)and welding inspectors (Cswip 3.2 & Cswip 3.1) )
  •  Rotary Equipment Inspection
  • Tubing Inspection and Corrosion Mapping by using the following technologies :

IRIS, NFA, NFT, RFT, ECA, ECT & MFL

  • Long Range Ultrasonic Test (LRUT)
  • Advance NDT Services (PAUT, TOFD, PMI)
  • Corrosion Mapping (RMS, MFL & Computerize Radiography (CR))
  • Conventional NDT (RT(Gamma Ray & X-Ray (Crawler and Directional)), UT(Flaw detection and Thickness ), PT, MT, Vacuum Test , Hardness Test )
  • Civil Inspection (impact Echo, Core Test, Schmitt Hammer , Ultrasonic Test and Lab. Test)
  • Coating inspection by certified engineers (NACE & BGAS) including (Surface test, painting and coating test & holiday test )
  • Rope Access services by certified IRATA Level III, Level II & Level I)

(Two year contract ) Extended to another two year and extend to another one year

Aug. 2014 – Feb. 2019

 

3

BGC

Storage Tanks inspection and testing services for 5 Storage tank in Khor Al Zubair and Am Qasar field including

  • Visual and Welding Inspection by API 653 and Cswip 3.2 certified inspector
  • Advance NDT (PAUT, TOFD)
  • Conventional NDT (RT(Gamma Ray & X-Ray (Crawler and Directional)), UT(Flaw detection and Thickness ), PT, MT, Vacuum Test )
  • Corrosion Mapping (RMS & MFL )
  • Hydrostatic Test
  • Civil Inspection (impact Echo, Core Test, Schmitt Hammer , Ultrasonic Test and Lab. Test)
  • Coating inspection by certified engineers (NACE & BGAS) including (Surface test, painting and coating test & holiday test )

 

July 2017- July 2019

 

4

Exxonmobil

Plant assessment with full NDT (traditional & advance & Corrosion Mapping) in WQ1 field development (DS6, DS7, DS8) for all static equipment (tanks, vessels, piping ,flow lines, wellheads) including

  • Visual Inspection by certified inspectors ((API 510, API 570 & API 653)and welding inspectors (Cswip 3.2 & Cswip 3.1) )
  • Corrosion Mapping (RMS & MFL )
  • Advance NDT (PAUT, TOFD)
  • Conventional NDT (RT(Gamma Ray & X-Ray (Crawler and Directional)), UT(Flaw detection and Thickness ), PT, MT, Vacuum Test )
  • Integrity Coordination
  • Rope Access services by certified IRATA Level III, Level II & Level I)

 

Sep. 2012 – Dec. 2017

 

5

CHIYODA

Inspection Services in Rumaila NGL Plants including

  • Static equipment inspection (Storage tanks, pressure vessels, piping systems, pipeline)
  •  Rotary equipment Inspection
  •  Electrical Inspection (MV & LV Systems)
  • Instrumentation Inspection and Calibration
  • Valve inspection
  • NDT
  • In Service Calibrations
  • HVAC System Inspection
  • Heat exchangers cleaning
  • Civil Inspections
  • HSE supervision

May 2014 – Nov. 2015

 

6

DNO

Provision of  Internal blasting and painting of FSK Crude oil storage tank in Fishkhabour

Jan. 2019 - Present

 

7

CPP

Nondestructive Testing (NDT (RT (Crawler & Directional), UT, MT, PT)) for pipelines sizes and Piping Network in  West Qurna 1

Jan. 2018 – Jan. 2019

 

8

Tekfan

NDT ( RT(Gamma Ray & X-Ray (Crawler and Directional), UT, PT & MT) IN Rumaila Oil Field

Oct. 2018 – Oct. 2020

 

9

ENI/Al Arabia

QA/QC Services in Zubair Oil field including

  • Static Equipment Inspection and Repair Management by Authorized API Inspectors
  • Corrosion Mapping (RMS) for 40 Pressure Vessels
  • Instrument Calibrations
  • PWHT Services
  • Cathodic Protection (CP) Tests
  • Electrical Tests

April 2018 – Present

 

PWHT, RT and Hardness Test work for vessels in north rumaila and Hamar Mushrif

  July 2018 - Present

 

10

ENKA

Provision of NDT Services for IOT Projects at west qurna 1

Nov. 2017- Present

 

11

TAQA

Provision of QA/QC, NDT (RT, UT) and coating inspection for pipeline and piping station in Atrush Oil Field

May-2017-Till Present

 

Provision of hydro-Static testing and Dewatering services for 2 flow lines  in Atrush oil field

April 2018 –May 2018

 

12

SAMSUNG

 

 

Provision of NDT Work (RT (Gamma Ray & X-ray) at Hammar Mushref Station, North Rumaila

Jan. 2017- April 2018

 

13

Una oil company

NDT ,PWHT and Hydrostatic test in WQ1 & Rumailla

March 2015-Sep. 2015

 

14

Bonatti

Painting of Pipe spool services in Badra oil field

Nov. 2018 – Jan.2019

 

Painting of equipment of Oily Tank in Badra Oil Field

Dec. 2018 – Jan. 2019

 

15

Alarabia Industrial company

NDT ,PWHT and Hydrostatic test in WQ1   T NDT,PWHT and Hydrostatic test in Majnoon oil field

May 2015 – Aug. 2015

 

16

Gama

NDT (Gamma Ray) & PWHT  in Hartha Power Plant

 

April. 2017 – Present 

 

 

17

SCOP

RT Work For Two Gas Pipelines (24”, 16”) 60 km Each.

June 2014 – August 2015

 

RT Work For Two Gas Pipelines (28”, 18”) 58 km Each.

April 2013 Till Dec. 2013

 

NDT for storage tanks

May 2013-Sep.  2013

 

18

HQC

NDT Services for south and north Rumaila oil field.

Sept. 2014 – June 2015

 

19

CCC

NDT Services (RT , UT, PT, MT) in North Rumaila Oil Field ( two year contract )

Jan. 2015 – Aug. 2015

 

20

ENI / STX

NDT service (RT, UT, PAUT) in Zubair oil field.

Oct. 2014 – Feb 2015

 

21

ENI / SICIM

NDT service in Zubair oil field.

Oct. 2014-Jan 2015

 

22

Shell/Majnoon

  • Vessel Inspection in DS1
  • Painting Inspection
  • NDT Inspection.
  • PWHT Services.

Oct. 2010 –  2015

 

23

KAR

 QA/QC & NDT for Construction of 78 Km 20” Pipeline &51 km *36", Flow lines 6”, pipeline 24”

May 2008 – Oct. 2014

 

Testing of Gas Pipeline ( QA/QC, NDT, Hydrostatic Test, Drying ) Khormalla Oil Field 130 Km.

Dec. 2012 – Oct. 2014

 

QA/QC, NDT in Construction of Khormalla Oil Field (CPF) (piping, storage tanks & mechanical equipment).

Nov. 2008 – Oct. 2010

 

QA/QC, NDT in Construction of Erbil Refinery 1 & 2.

Oct. 2008 – May 2010

 

QA/QC, RT for 24” & 36” pipeline in Baviam area/Shikhan in Kurdistan Iraq

Dec. 2017 –Feb. 2018

 

QA/QC , NDT for Khormalla power plant

Sep. 2013 – May 2014

 

24

KAR GROUP (Crescent-Danagas  Subcontractor)

QA/QC, NDT in Construction of LPG Recovery Plant.

May 2008 – March 2009

 

25

Crescent

INSPECTION , REPLACEMENT GUIDE & ANCHOR BOLTS for 4 Vessels (2  De-ethanizer Tower and 2 De-butanizer tower

April 2018 - Present

 

26

Luckoil / Techno  

RT for 42"  Export pipeline in WQ2 oil field

Dec. 2012

 

27

CPECC (AHDAB Oil Field)

Pipeline full construction, NDT (100% RT, 100% UT), 100% PWHT, CP, hydrostatic for:

-155 KM, 6“ Flow lines

-81KM ,16” trunk line

-70KM 10” Export pipeline

-70KM 16” export Gas pipeline

Sep. 2010 To 2012

 

28

CPPB (AHDAB Oil Field)

100% RT for 36" Pipeline EXL4. 70 Km

Feb. 2011 – April 2011

 

 

29

Cpecc (Halfaya Oil Field)

Pipeline construction, NDT (100% RT, 100%UT, 100% PWHT), CP, FOC, hydrostatic for around 35 KM (6'', 8'', 10'') flow lines.

Feb. 2012 – Dec. 2012

 

30

Halleburton

NDT activities

Nov. 2010 To 2012

 

31

Techno (AL-AHDAB Oil Field & MAJNOON)

 

100% RT For 24" Pipeline EXL1 212 km. (CPECC / Ahdeb)

NDT For Brown Field MAJNOON (shell)

Dec. 2009 – To 2013

 

 

32

ENKA (MAJNOON) 

NDT in MAJNOON Oil Field.

Nov. 2011 – May 2012

 

33

Weir Service

NDT & PWHT in Zubair oil field.

May 2012 – Jan 2013

NDT for 0.5”-24 “ pipe in North Rumaila

April 2016-Till Present

34

Ibn Majid company

PWHT for pressure vessels

RT for pipelines in WQ1

Periodic order

35

Petrofac

NDT Work in Majnoon Oil Field.

 

April 2012 – Aug. 2012

36

ABB

QA/QC And NDT in Erbil Gas Power Stations (500 MW).

April 2007 – Sep. 2008

37

SIEMENS

NDT for piping in Taza Power Station.

May 2014 - Nov. 2014

38

LACKSHORE

NDT, Hydrostatic in Garraf Oil Field.

Dec. 2012 to 2013

39

Weatherford

UT & Hydrostatic for piping.

Jan. 2013 to Feb. 2013

40

Dana Gas

NDT Work For The Flow Lines & Piping

2008

41

ALMCO Co. (Washington Group)  

NDT service in Basrah Gas Factory

NDT service in WQ1

 

2012,2016

 

42

RTD Applus

Digital radiography (CR) in DS5/Rumaila Oil Field

March 2014

43

Pan East

NDT activities in Zubair oil field.

 

2013

44

Energy Logistics

NDT activities in Erbil.

2014

45

HERMIC (HALFAYA)

NDT & PWHT for trunk  lines in  HALFAYA Oil Field

Dec. 2011 – June 2012

46

Sert Company

 

NDT & PWHT flow lines in HALFAYA Oil Field.

March 2012-Sep. 2012

47

MEE

Hydrostatic, PWHT, NDT for Al Garraf Export Pipeline 7 km.

Sep. 2012 to 2013

48

MOC

Supplying and training of NDT equipment

Dec. 2014

49

PES   

NDT in TAQTAQ Oil Field.

 

June 2010 - 2011

50

TAAM (BP Subcontractor)

RT For The Flow Lines in Rumaila Oil Field.

 

June 2011

51

The Pioneer Co.

 

QA/QC, NDT For Kubaisa Cement Factory Rehabilitation.

Dec. 2010 – Feb. 2011

52

Mass Global Investment

Gas turbine inspection (FPI.UT, MT, VT) in Sulimanya & Erbil Gas power plant and Erbil gas power plant

Periodic Test

53

TAGC   

NDT (RT, PT, Vacuum test, Hydrostatic, holiday test, coating) for tanks and piping.

April 2013 – May. 2014

54

EMC

NDT & QA/QC

Oct. 2013

55

Ratbaa    

RT for pipeline, piping & CP test posts.

June 2013

 

 

NYCO Group

If you have any construction or inspection work need, simply
call us anytime.

+964-7707883113 or Contact Us

Developed by eSITE