Construction & Maintenance Projects

Home Services

Construction & Maintenance Projects

No.

Client

Project

Period

1

TAQA

Provision of QA/QC, Inspection and coating for pipeline and piping station in Atrush Oil Field

May-2017-Till Present

2

SAMSUNG

 

Provision of NDT Work (X-ray) at Zubair Hammar Mushref, North Rumaila

Jan.2017- Till Present

3

SCOP

Construction of 24" pipeline 30 km by using automatic welding technology.

Jan. 2014 – Feb 2015

4

CHIYODA

NGL Maintenance supervision (Static equipment, rotary equipment, electrical, civil, heat exchanger cleaning, instrumentation, valve inspection, Overhead cranes rehabilitation, HSE supervision)

May 2014 – Nov.2015

5

BGC / SHELL

Overhead cranes rehabilitation

Aug. 2014 – May 2015

6

CCC

Electrical construction, Test and commissioning of MV &LV system of Gas plant in Rumaila oil field.

Oct. 2015 –April 2016

 

 

7

GAZPROM

Topographical & Geotechnical Survey OF Oil & Gas Export 268 km Pipelines.

Topographical Survey & Geotechnical Survey Badra Tank Farm

Dec. 2011 – Sep. 2012

Repair & Maintenance for (8”,22”,24” & 28” & GRE (4”&16”)) pipelines in Badra Oil Field

Oct.2016 - Present

8

DNO

Installation testing & commissioning  of 44 km Fiber Optic Cable (FOC) in Tawki Oil Field

Jan. 2016 – May 2016

MECHANICAL, PIPING AND STRUCTURAL CONSTRUCTION SERVICES in Tawki oil Field

April. 2017 - Present

9

Crescent  

Maintenance for 24” gas pipeline in  Chamchamal

March 2016- April 2016  

10

Alinmaa Company

Extension, Test & Commissioning of al baker 132 kv GIS substation

Feb. 2016 –June 2016

11

Saad Company

Fabrication & Installation of the Piping (Carbon Steel & Stainless Steel) in different pipe sizes for catalytic reforming unit in Basra refinaly 

Jan 2012 – July 2012

12

Shell/Majnoon

  • Topographic Surveying for pipeline
  • Fixing of Control Network in MAJNOON Field in DS1 & DS2 With Shell Company As Well As QC For All CPF Structure Coordinates.

 

Oct. 2010 –  2015

13

 Technip

Rehabilitation (Electrical & Mechanical) of overhead cranes (10 T &20 T) in Basra gas factory.

Dec. 2014  – May 2015

 

14

KAR GROUP

-Maintenance work for Erbil refinery equipment ( pressure vessels, towers, heat exchanger , piping , valves )

-Pressure safety valve repair and setup

April  2015- june  2015

Instrument system installation, test and commissioning for Erbil refinery unit 1 & 2

Oct. 2008 – May 2010

Instrument system installation, test and commissioning for Erbil refinery unit 3 & 4

April 2010 - Sep. 2010

15

CPECC AHDAB Oil Field)

Pipeline full construction, NDT (100% RT, 100% UT), 100% PWHT, CP, hydrostatic for:

-155 KM, 6“ Flow lines

-81KM ,16” trunk line

-70KM 10” Export pipeline

-70KM 16” export Gas pipeline

Laying ,splicing and test of 81KM FOC

 

Sep. 2010 To 2012

16

Cpecc (Halfaya Oil Field)

Pipeline construction, NDT (100% RT, 100%UT, 100% PWHT), CP, FOC, hydrostatic for around 35 KM (6'', 8'', 10'') flow lines.

Feb. 2012 – Dec 2012

17

HALLIBURTON

-Fabrication  of steel structures in NYCO workshop

 

Nov. 2010 To 2012

18

INTECH INSTRUMENT LTD 

Instrumentation system installation, testing and commissioning and calibration Work in Shikhan Oil Field.

July 2012 – Dec. 2012

19

ORYX petrolum

Pressure safety valve repair and setup

Feb 2015- June 2015

20

Petrofac

Geotechnical work in Rumaila oil field

Civil inspection in Rumaila oil field

April 2012 – Aug. 2012

21

Fiafi Group 

Geotechnical Surveying Work Rumailla

Concrete Foundation Assessment

Feb. 2013

22

Al-Hayat Co  

Installation, test and commissioning of Pepsi cola factory /Erbil (Mechanical, Electrical & Instrumentation).

Feb. – June 2008

23

 Al Mansuria Company

Rehabilitation of Jurf Albamer water treatment plant( electrical, Instrumentation, Mechanical)

2004

24

Al Mansuria Company

Rehabilitation of Al Ramadi Al jadeed water treatment  plant

  • 10”x500 m ductal iron pipeline,
  • water intake station,
  • rehabilitation work for  electrical, Instrumentation, mechanical )

2004

25

ALMCO Co. (Parsons Subcontractor)

Construction of Alsader Water Treatment Plant(Tanks, piping, electrical ,instrumentation ,civil)

Nov. 2005 – Feb. 2008

26

Pioneer

Rehabilitation Al-Rustomia & Al-Karkh Sewage Treatment Plant

  • construction of 16” x1500m Ductile pipeline
  • construction of piping, electrical ,instrumentation ,civil)

Sep. 2004 – April 2005

27

South East Texas Co.

Mechanical Construction in Al Musaiab Gas Power Station(storage tanks , piping networks & steel structures)

July 2004 – Feb. 2006

 

28

KADO Co. (PARSONS Subcontractor)

 

Construction of Al- Zafaraniya Trunk Sewer Line-Pump Station.

May 2006 – July 2006

29

Other Activities Done According Request

Lifting Equipment Inspection, NDT, Welding Consultancies, Welder Training, NDT Training, Rotary Equipment Performance Test, Plant Assessments.

 

NYCO Group

If you have any construction or inspection work need, simply
call us anytime.

+964-7707883113 or Contact Us