NDT & PWHT Project

Home Services

NDT & PWHT Project

No.

Client

Project

Period

1

EXXON MOBIL

Plant assessment with full NDT (traditional & advance) in WQ1 field development (DS6, DS7, DS8) for all static equipment (tank, vessels, piping ,flow lines, wellheads)

16/9/2012 – Till present

2

 BP

NDT Services, PWHT for south and north rumaila oil field ( three year Contract ).

April 2014 – April 2017

NDT & Plant integrity for south and north rumaila oil field (Five years Contract)

May 2017 - Present

3

BGC / SHELL

NDT services (traditional and advance) in all BGC sites ( Two year contract ) Extended to another two year

Aug. 2014 – Till present

4

 CHIYODA

NGL Inspection  (Static equipment, rotary equipment, NDT, electrical, civil, instrumentation, valve inspection, HSE supervision)

May 2014 – Nov.2015

5

TAQA

Provision of QA/QC, Inspection and coating for pipeline and piping station in Atrush Oil Field

May-2017-Till Present

6

SAMSUNG

 

Provision of NDT Work (X-ray) at Zubair Hammar Mushref, North Rumaila

Jan.2017- Till Present

7

Una oil company

NDT ,PWHT and Hydrostatic test in WQ1 & Rumailla

March 2015-Sep. 2015

8

Alarabia Industrial company

NDT ,PWHT and Hydrostatic test in WQ1   T NDT,PWHT and Hydrostatic test in Majnoon oil field

May 2015 – Aug. 2015

9

Gama

NDT in Hartha Power Plant

April. 2017 – Present 

10

 SCOP

RT Work For Two Gas Pipelines (24”, 16”) 60 km Each.

June 2014 – August 2015

RT Work For Two Gas Pipelines (28”, 18”) 58 km Each.

April 2013 Till Dec. 2013

NDT for storage tanks

May 2013-sep 2013

11

 HQC

NDT Services for south and north Rumaila oil field.

Sept. 2014 – June 2015

12

 CCC

NDT Services  ( two year contract )

Jan. 2015 – Aug. 2015

13

ENI / STX

NDT service (RT, UT, PAUT) in Zubair oil field.

Oct. 2014 – Feb 2015

14

ENI / SICIM 

NDT service in Zubair oil field.

Oct. 2014-Jan 2015

15

Shell/Majnoon

  • Vessel Inspection in DS1
  • Painting Inspection
  • NDT Inspection.
  • PWHT Services.

Oct. 2010 –  2015

16

 KAR GROUP

  QA/QC & NDT for Construction of 78 Km 20” Pipeline &51 km *36", Flow lines 6”, pipeline 24”

May 2008 – Oct. 2014

Testing of Gas Pipeline ( QA/QC, NDT, Hydrostatic Test, Drying ) Khormalla Oil Field 130 Km.

Dec. 2012 – Oct. 2014

QA/QC, NDT in Construction of Khormalla Oil Field (CPF) (piping, storage tanks & mechanical equipment).

Nov. 2008 – Oct. 2010

QA/QC, NDT in Construction of Erbil Refinery 1 & 2.

Oct. 2008 – May 2010

17

KAR GROUP (Crescent-Danagas  Subcontractor)

QA/QC, NDT in Construction of LPG Recovery Plant.

May 2008 – March 2009

18

Luckoil / Techno   

RT for 42"  Export pipeline in WQ2 oil field

Dec. 2012

19

CPECC AHDAB Oil Field)

Pipeline full construction, NDT (100% RT, 100% UT), 100% PWHT, CP, hydrostatic for:

-155 KM, 6“ Flow lines

-81KM ,16” trunk line

-70KM 10” Export pipeline

-70KM 16” export Gas pipeline

Sep. 2010 To 2012

20

CPPB (AHDAB Oil Field)

100% RT for 36" Pipeline EXL4. 70 Km

Feb. 2011 – April 2011

 

21

Cpecc (Halfaya Oil Field)

Pipeline construction, NDT (100% RT, 100%UT, 100% PWHT), CP, FOC, hydrostatic for around 35 KM (6'', 8'', 10'') flow lines.

Feb. 2012 – dec 2012

22

 HALLIBURTON

-NDT activities

Nov. 2010 To 2012

23

Techno (AL-AHDAB Oil Field & MAJNOON)

 

100% RT For 24" Pipeline EXL1 212 km. (CPECC / Ahdeb)

NDT For Brown Field MAJNOON (shell)

Dec. 2009 – To 2013

 

24

ENKA (MAJNOON) 

NDT in MAJNOON Oil Field.

Nov. 2011 – May 2012

25

Weir Service 

NDT & PWHT in Zubair oil field.

May 2012 – Jan 2013

26

Ibn Majid company

PWHT for pressure vessels

RT for pipelines

Periodic order

27

 Petrofac

NDT Work in Majnoon Oil Field.

 

April 2012 – Aug. 2012

28

ABB

QA/QC And NDT in Erbil Gas Power Stations (500 MW).

Duration April 2007 – Sep. 2008

29

 SIEMENS

NDT for piping in Taza Power Station.

May 2014 - Nov. 2014

30

 LAKESHORE

NDT, Hydrostatic in Garraf Oil Field.

Dec. 2012 to 2013

31

Weatherford

UT & Hydrostatic for piping.

Jan. 2013 to Feb. 2013

32

Dana Gas 

NDT Work For The Flow Lines & Piping

2008

33

ALMCO Co. (Washington Group)  

NDT service in Basrah Gas Factory

NDT service in WQ1

 

2012,2016

 

34

RTD Applus

Digital radiography (CR) in DS5

March 2014

35

Pan East

NDT activities in Zubair oil field.

 

Periodic Test

36

Energy Logistics

NDT activities in Erbil.

Periodic Test

37

HERMIC (HALFAYA)

NDT & PWHT for trunk  lines in  HALFAYA Oil Field

Dec. 2011 – June 2012

38

Sert Company

NDT & PWHT flow lines in HALFAYA Oil Field.

March 2012-Sep. 2012

39

MEE

Hydrostatic, PWHT, NDT for Al Garraf Export Pipeline 7 km.

Sep. 2012 to 2013

40

MOC

Supplying and training of NDT equipment

Dec. 2014

41

PES   

NDT in TAQTAQ Oil Field.

June 2010 - 2011

42

TAAM (BP Subcontractor)

RT For The Flow Lines in Rumaila Oil Field.

Duration June 2011

43

The Pioneer Co.

 

QA/QC, NDT For Kubaisa Cement Factory Rehabilitation.

Dec. 2010 – Feb. 2011

44

Mass Global Investment

Gas turbine inspection (FPI.UT, MT, VT) in Sulimanya & Erbil Gas power plant and Erbil gas power plant

Periodic Test

45

TAGC    

NDT (RT, PT, Vacuum test, Hydrostatic, holiday test, coating) for tanks and piping.

April 2013 – May. 2014

46

EMC

NDT & QA/QC

Oct. 2013

47

Ratbaa    

RT for pipeline, piping & CP test posts.

June 2013

48

Other Activities Done According Request

Lifting Equipment Inspection, NDT, Welding Consultancies, Welder Training, NDT Training, Rotary Equipment Performance Test, Plant Assessments.

 

NYCO Group

If you have any construction or inspection work need, simply
call us anytime.

+964-7707883113 or Contact Us

Developed by eSITE